Friday, 23 January 2015

Week 10 (the big crane arrives on site today)

This monster 'big boys toy' crane arrived on site today to erect the galvanised steelwork for the balcony along with the remaining steels required to allow the brickies to get started next week.

The balcony will be on the first floor and requires a cantilevered design to support the weight.  Hopefully we'll be able to sit out there next summer and enjoy a nice glass of red in the evening sunshine.

I also had a brief meeting with Peter (the builder) and Ewan (the architect) on site to fine tune the design and develop a few ideas for further down the line. 