They've started laying the first floor platform and strapping the walls.
It's now possible to get sense of the room sizes and overall layout of the building.
![]() |
| Susan checks the hall for size |
![]() |
| One of the joiners laying the engineered floor joists |
![]() |
| The upstairs floor starts to take shape |
All, hopefully, this side of the Easter weekend.



No comments:
Post a Comment